The Lunar WeekNovember 23 – November 29, 2026
The Lunar Week: SPARC solicitation, Pegasus design review, RS-25 test, GomSpace contract
No lunar launches or landings are scheduled this week. NASA posted its final SPARC reactor solicitation, Lunar Outpost's Pegasus passed a NASA design review, NASA tested an RS-25 engine and GomSpace won a lunar prospecting contract; the tracker's scores did not change.
Published
How this was made: This article was AI-drafted from the SpaceNexus lunar database and the news sources listed below, fact-checked by a second, independent AI pass against those same inputs, and approved by the editor before publication.
This week on the Moon
No lunar launches or landings are scheduled from November 23 to November 29. Launch Library 2 lists launches in that span, none of them to the Moon, and no lunar mission events.
United States
NASA posted the final request for proposals for its Space Power and Reactor Capabilities (SPARC) contract on SAM.gov on November 20, with proposals due at 5 p.m. Eastern on December 21, 2026. The package includes a model task order, a statement of work and a data procurement document for Lunar Reactor-1 Phase 1.[1]
NASA said on November 20 that its Small Business Innovation Research and Small Business Technology Transfer program recently selected 302 projects for up to $171 million in seed funding. The selections include work on bringing power to the surface of the Moon and Mars, robotic systems for the extreme lunar environment and tools to prepare for building lunar landing pads.[2]
NASA tested developmental RS-25 engine No. 10001 for its planned 200 seconds on November 18 at Stennis Space Center in Mississippi. NASA said the engine will not fly, but the test gives NASA and L3Harris data to improve RS-25 performance and reliability for future Artemis missions. The release notes that SLS is to launch astronauts on the Artemis IV Moon landing mission in 2028.
Lunar Outpost said on November 19 that its Pegasus lunar terrain vehicle has completed NASA's preliminary design review. NASA announced on May 26 that it had awarded Lunar Outpost $220 million to build and deliver the first phase of its lunar terrain vehicles. The Golden, Colorado, company said it is on schedule to deliver a flight-ready Pegasus to NASA in late 2027, ahead of a planned delivery to the Moon in 2028.[3]
China
Phys.org reported on November 19 that an international team led by geologists at the University of Hong Kong used Chang'e-6 samples and Chang'e-4 data to trace how the South Pole-Aitken basin, the Moon's largest impact basin, evolved after the impact that formed it. The study is published in Science Advances.[4]
Elsewhere
GomSpace announced on November 19 an €8 million (89.1 million Swedish kronor) contract from what it called a leading North American space company, for the second phase of a lunar mission program in which two satellites will conduct resource prospecting. GomSpace said delivery is scheduled for late 2027. European Spaceflight reported that the customer is Blue Origin, citing earlier remarks by GomSpace's chief executive on the company's earnings calls.[5]
KSAT said on November 17 that it, ESA and Spain's INTA have entered into a collaboration under which KSAT will establish a lunar communications site with a 20-meter-class antenna near ESA's ground station in Cebreros, Spain. KSAT describes its lunar network as sites distributed across three continents, including its Western Australian and Arizona sites.
Tracker check
The tracker's scores did not change from November 15 to November 22: its published changelog has no entry dated in that span, and the latest entry is version 1.0.5 from November 2.[6]
As of its November 17 data review, the tracker shows the United States at 3.5 of 8 rungs on the crewed landing ladder, with an official target of 2028 for Artemis IV, and China at 1.75 of 8 rungs, with an official target of before 2030 (2030年前). Its status reads "United States leads on demonstrated milestones".[7][8]
On the permanent presence ladder, the tracker shows the United States at 1 of 8 rungs and China at 1.25 of 8 rungs, with the status "Level on demonstrated milestones". The projected first crewed landing entry reads "Too close to call".[9][10][11]
Sources
- NASA Releases Final SPARC Solicitation for Space Nuclear Systems, New Space Economy, 2026-11-22
- New NASA Seed Funding Primes Small Businesses for Innovation, NASA, 2026-11-20
- Pegasus lunar terrain vehicle passes NASA design review, SpaceQ, 2026-11-20
- Lunar sample research yields new discoveries, revealing the history of the moon's largest impact basin, Phys.org, 2026-11-19
- Denmark’s GomSpace Secures €8M Contract for Blue Origin Moon Mission, European Spaceflight, 2026-11-21
- Moon tracker method changelog, SpaceNexus lunar tracker, 2026-11-22
- Crewed landing ladder (tracker), SpaceNexus lunar tracker, 2026-11-17
- Crewed landing ladder (tracker), SpaceNexus lunar tracker, 2026-11-17
- Permanent presence ladder (tracker)