Supplier · United States
It built Lonestar's Freedom server, which flew on IM-2 in February 2025. Its next announced step is axODC Node ISS delivery, stated as 2027.
Shared launches: IM-2 (2025-02-26) with Lonestar.
Stage 4 of 7: Payload demo flown
It built Lonestar's Freedom server, which flew on IM-2 in February 2025.[1]
What the stage means: Compute or storage flown as a hosted payload or on the ISS. It flew as a supplier to someone else’s satellite.
DoneReported
Built Lonestar's Freedom lunar data server (flew on IM-2)
Source: Tom's Hardware
DoneConfirmed
Leads AxODC Node ISS design with Axiom
Source: Axiom Space
Targets as the organisation stated them. When a date moved, every move is listed with its source; a narrower window is shown as a narrowing.
2027
AxODC Node ISS delivery[1]
What to watch · SpaceNexus note, not a prediction
Delivery of the Axiom ISS node in 2027.
Dennis Wingo (founder, President and CTO)
| Program | Stage | Verified funding | Next step |
|---|---|---|---|
| Spacebilt (this page) | Stage 4 of 7: Payload demo flown | Not counted | 2027: AxODC Node ISS delivery |
| AWS | Stage 4 of 7: Payload demo flown | Not counted | None announced |
| Astro Digital | Stage 4 of 7: Payload demo flown | Not counted | Q1 2027: SPAC close and Nasdaq listing |
| Axiom Space | Stage 4 of 7: Payload demo flown | Not counted | 2027: AxODC Node ISS (petabyte-class, optical link) delivered to the ISS |
| Booz Allen | Stage 4 of 7: Payload demo flown | Not counted | None announced |
| D-Orbit | Stage 4 of 7: Payload demo flown | Not counted | None announced |
| Edge Aerospace | Stage 4 of 7: Payload demo flown | Not counted | None announced |
Evidence reviewed 5 Oct 2026, fact-checked against primary sources. Nothing on this page is sponsored, and no company can pay to change, reorder or preview it. Spotted an error? Report a correction. How stages and labels work.
Week in Space Data, every Friday.