Week in Space Data, every Friday.
This launch ended in a failure
Liftoff
Counts are flown launches (successes, partial failures and failures) in the SpaceNexus launch record for the calendar year, up to and including this one. The outcome is Launch Library 2’s own label. Booster serials and reuse counts are not in our records; the provider publishes them.
Liftoff Nov 15, 2026, 17:40 UTC. Live chat ran from two hours before liftoff to two hours after.
Every entry is a change we recorded, not a forecast. Our sync checks Launch Library 2 every 15 minutes, so a time is when we saw the change and can trail the real moment. The liftoff time is the one the launch record states.
Target moved: placeholder roll
Sep 30, 2026 (placeholder) to Oct 2026
recorded by the launch ledger
Target moved: firmed
Oct 2026 to Oct 29, 2026
recorded by the launch ledger
Target moved: lost its date
Oct 29, 2026 to Nov 2026
recorded by the launch ledger
Target moved: firmed
Nov 2026 to Nov 13, 2026
recorded by the launch ledger
Target moved: same-day change (+17.9 h)
Nov 13, 2026, 00:00 UTC to 17:54 UTC
recorded by the launch ledger
Status: Go for launch
Launch Library 2 marks the launch time as confirmed by official or reliable sources.
recorded by the status sync
Scrubbed
New target: Sat, Nov 14, 17:32 UTC
recorded by the status sync
Target moved: same-day change (+23.7 h)
Nov 14, 2026 to Nov 15, 2026
recorded by the launch ledger
Target moved: same-day change (+0.3 h)
Nov 15, 2026, 17:11 UTC to 17:31 UTC
recorded by the launch ledger
Status: Hold
The count is on hold; the provider has not named a new time yet.
recorded by the status sync
Target moved: same-day change (+0.2 h)
Nov 15, 2026, 17:31 UTC to 17:40 UTC
recorded by the launch ledger
Liftoff
from the launch record
Status: In flight
recorded by the status sync
Outcome recorded: Failure
recorded by the status sync
Make your calls before liftoff. Free, no account needed, and each one settles on the recorded outcome of the flight, not on anyone's opinion.
Result: No: scrubbed or delayed past window
Play with friends: private leaguesJust for fun, no prizes.
Checking for a discussion…
Part of a tracked program. See it on the Amazon Leo (formerly Project Kuiper) tracker, with the program's contracts, satellites and launch slips.
Every change of more than a minute to this launch's date, as we observed it. Only a move between two dates known to the day counts as a slip; a placeholder such as “NET 2026” rolling to “2027” is shown but not counted. How we classify moves · on-time record by provider
Vulcan Centaur (United Launch Alliance)
Vulcan Centaur uses two BE-4 engines on its first stage and a Centaur V upper stage with RL10 hydrogen engines. Solid rocket boosters strap on for heavier missions; the number is in the rocket’s configuration.
Source: ULA: Vulcan Centaur, checked 2026-09-27The provider's page for this flight
The broad sequence of an orbital launch. Details and times differ by rocket and mission; this is a guide, not live tracking.
In the last part of the count the rocket is fuelled, systems switch to internal power and the launch team is polled for a go.
The first-stage engines ignite and the rocket leaves the pad.
The moment of maximum aerodynamic pressure on the rocket during ascent.
The spent first stage separates and the upper stage takes over. Some rockets also drop side boosters earlier in the climb.
The upper stage burns to reach the planned orbit, sometimes in more than one burn with a coast in between.
The payload separates from the upper stage. On a crewed flight the capsule separates and flies on under its own power.