5 entries: 2 met; 3 revised.
Plain counts, not a grade or a ranking. A short record is not a complete one. Checked against sources on Sep 26, 2026; scoring rules on the methodology page.
This first release is a selection, and a short record is not a complete record. Each programme milestone enters the ledger at its earliest dated public commitment we can find in a primary source, for governments and companies alike. Later dated commitments for the same milestone are shown on that one entry as a revision chain, oldest first, rather than as separate entries.
Revised · worded as a target
First flight · ESA
“Vega-C is expected to debut in mid-2019”
Said . Source: ESA: Rocket motor for Ariane 6 and Vega-C is cast for testing (Oct 13, 2017, last paragraph)
Context: ESA article on casting the first P120C development motor.
Later dated commitments for the same milestone
The counts use the original commitment. The latest date in the chain stands as: met.
Outcome: Vega-C flight VV21 lifted off from Kourou at 13:13 UTC on 2022-07-13. The June 2021 date in the chain passed before ESA’s next dated statement (2021-07-21). (, on or before the latest deadline)
Outcome source: ESA: Vega-C successfully completes inaugural flight (Jul 13, 2022)
Checked against the source on Sep 26, 2026. Report a correction or send a response to this entry
Revised · worded as a commitment
Launch · ESA (Joint ESA and Roscosmos decision)
“they jointly decided to move the launch to the next available Mars launch window in July 2020”
Said . Source: ESA: Second ExoMars mission moves to next launch opportunity in 2020 (May 2, 2016, paragraph 5)
Context: 'They' are ESA Director General Johann-Dietrich Woerner and Roscosmos Director General Igor Komarov; the mission had been planned for 2018.
Later dated commitments for the same milestone
The counts use the original commitment. The latest date in the chain stands as: withdrawn.
Outcome: On 17 March 2022 ESA's Council acknowledged "the present impossibility of carrying out the ongoing cooperation with Roscosmos on the ExoMars rover mission with a launch in 2022" and mandated steps to suspend it; on 28 March 2022 ESA said the 2022 launch window was no longer possible. The rover had not launched as of 2026-09-26.
Outcome source: ESA: ExoMars suspended (Agency N° 9-2022) (Mar 17, 2022)
Checked against the source on Sep 26, 2026. Report a correction or send a response to this entry
Revised · worded as a target
First flight · ESA
“Ariane 6’s maiden flight is planned for 2020.”
Said . Source: ESA: Rocket motor for Ariane 6 and Vega-C is cast for testing (Oct 13, 2017, last paragraph)
Context: ESA article on casting the first P120C development motor; earliest dated ESA page with an Ariane 6 first-flight date that we fetched (older ESA pages were not reachable).
Later dated commitments for the same milestone
The counts use the original commitment. The latest date in the chain stands as: met.
Outcome: Ariane 6 lifted off on its first flight from Kourou on 9 July 2024 and deployed its satellites; the upper stage Auxiliary Propulsion Unit stopped after its second ignition, so the third Vinci burn and the deorbit did not take place. (, on or before the latest deadline)
Outcome source: Arianespace: Ariane 6: post-launch update (Jul 31, 2024)
Checked against the source on Sep 26, 2026. Report a correction or send a response to this entry
Met · worded as a target
First flight · ESA
“ESA, CNES and ArianeGroup are targeting the first launch of Ariane 6 between mid June and end of July 2024.”
Said . Source: ESA: Ariane 6 joint update report, 30 November 2023 (Nov 30, 2023, section 'First flight period')
Context: Ariane 6 joint update report of the Launcher Task Force (ESA, CNES, ArianeGroup, Arianespace). Restated as 'between 15 June and 31 July 2024' in the 22 February and 26 April 2024 reports.
Outcome: Ariane 6 lifted off on its inaugural flight (VA262) from Kourou at 16:00 local time on 9 July 2024 and released its satellites in orbit. (, on or before the deadline)
Outcome source: ESA: Europe's new Ariane 6 rocket powers into space (Jul 9, 2024)
Checked against the source on Sep 26, 2026. Report a correction or send a response to this entry
Met · worded as a target
Launch · ESA
“The motor features an improved engine nozzle design, required to prepare for a Vega-C return-to-flight by the end of 2024.”
Said . Source: ESA: Successful engine test boosts Vega-C towards return-to-flight (May 28, 2024, paragraph 1)
Context: The Zefiro-40 second-stage motor was redesigned after the Vega-C VV22 failure in December 2022.
Outcome: Vega-C flight VV25 lifted off from Kourou at 22:20 CET on 5 December 2024 and placed Sentinel-1C in orbit. (, on or before the deadline)
Outcome source: ESA: Double win for Europe: Sentinel-1C and Vega-C take to the skies (Dec 6, 2024)
Checked against the source on Sep 26, 2026. Report a correction or send a response to this entry
Open data: download the whole ledger (CSV, CC BY 4.0). Cite as “SpaceNexus Promise Ledger” with a link. How entries are scored: methodology. No sponsor, advertiser or partner can add, remove, reorder, annotate or preview an entry, and these pages carry no advertising.
The whole Promise Ledger, with every organisation and person, and the topic trackers.
Week in Space Data, every Friday.