Week in Space Data, every Friday.

ISRO · India · First flight 2017
India's heaviest launch vehicle, used for Chandrayaan-3 lunar mission and OneWeb constellation deployment. Features indigenous CE-20 cryogenic upper stage engine. Also designated for the Gaganyaan crewed program.
Want to choose exactly what you get? Build your own launch alert, free with an account: GO, liftoff, success, partial failure or failure, time changes, holds and scrubs, and reminders a day, an hour and ten minutes (push) before launches with an exact time, filtered by rocket, launch site, provider, crewed flights or Moon missions.
From SpaceNexus's launch tracker; outcomes recorded as each flight lands. Career totals above are the vehicle's full history.
No LVM3 (GSLV Mk III) launches on the tracked manifest yet.
| Height | 43.4 m |
| Diameter | 4 m |
| Liftoff mass | 640,000 kg |
| Stages | 3 |
| Engines | 2x S200 SRBs + 2x Vikas + 1x CE-20 |
| Propellant | HTPB (SRBs) + UDMH/N2O4 + LH2/LOX |
| Fairing diameter | 5 m |
| Payload to LEO | 10,000 kg |
| Payload to GTO | 4,000 kg |
| Payload to SSO | – |
| Payload to TLI | – |
| Reusable | No |
| First flight | 2017-06-05 |
| Last flight | Active |
| Variants seen on the manifest | – |
A dedicated LVM3 (GSLV Mk III) launch lists at roughly $47 million, about $4,700 per kilogram to low Earth orbit at full payload. Actual contract prices vary with orbit, integration and government requirements.
No LVM3 (GSLV Mk III) launch is currently on the tracked manifest.
LVM3 (GSLV Mk III) has flown 9 times as of 2026-09-01, with 9 successes, 0 failures and 0 partial failures: a 100% success rate, with 9 consecutive successes at last count.
10,000 kg to low Earth orbit, 4,000 kg to geostationary transfer orbit.