Race to the Moon
173 rows: every spacecraft that left Earth for the Moon, every launch attempt that did not, and the missions on today’s manifests. Launch dates are UTC; where a local date differs it is shown beside it. Claims no source could confirm carry an “Unconfirmed” label.
Data reviewed against sources as of · All dates UTC unless a local time is shown
Showing 173 of 173. Download the full catalogue (CSV), free to reuse with attribution to SpaceNexus (CC BY 4.0; how to cite). Missions with their own page are linked by name. Landing attempts only: every Moon landing attempt.
| Launch (UTC) | Mission | Result | Key events, firsts, sources |
|---|---|---|---|
| Launch: | Pioneer 0 (Able I)US (United States)US Air Force · Orbiter | Launch failure | Launched by the US Air Force. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna Ye-1 No.1USSR (Soviet Union)USSR · Impactor | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Pioneer 1US (United States)United States · Orbiter | Launch failure | Reached about 114,750 km (Siddiqi; an older NASA figure is 113,800 km) and fell back to Earth. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna Ye-1 No.2USSR (Soviet Union)USSR · Impactor | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Pioneer 2US (United States)United States · Orbiter | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna Ye-1 No.3USSR (Soviet Union)USSR · Impactor | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Pioneer 3US (United States)United States · Flyby | Launch failure | Fell back to Earth. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna 1USSR (Soviet Union)USSR (OKB-1) · Flyby | Partial |
Firsts: First spacecraft to pass the Moon and to escape Earth’s gravity Sources differ: Intended as an impactor. NSSDCA classes it as a flyby; Siddiqi credits the first flyby to Luna 3 because Luna 1 was a failed impactor. Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Pioneer 4US (United States)NASA · Flyby | Partial |
Firsts: First US spacecraft to escape Earth Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna Ye-1A No.5USSR (Soviet Union)USSR · Impactor | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna 2USSR (Soviet Union)USSR · Impactor | Success |
Firsts: First object to hit the Moon Sources differ: Sources print the impact as 13 or 14 Sep: 21:02 UTC on 13 Sep was already 14 Sep in Moscow (00:02:24 Moscow time in the Soviet announcement). Our cited sources disagree on the time: Siddiqi prints "21:02:23 UT on 14 September", the NSSDCA record "23:02:23 UT" and the NSSDCA Soviet page "~07:30 UT". Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 3USSR (Soviet Union)USSR · Flyby | Success |
Firsts: First images of the lunar far side Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Pioneer P-3 (Able IVB)US (United States)United States · Orbiter | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna Ye-3 No.1USSR (Soviet Union)USSR · Flyby | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna Ye-3 No.2USSR (Soviet Union)USSR · Flyby | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Pioneer P-30US (United States)United States · Orbiter | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Pioneer P-31US (United States)United States · Orbiter | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Ranger 1US (United States)NASA / JPL · Test / precursor | Launch failure | Ranger test flight stranded in Earth orbit. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | Ranger 2US (United States)NASA / JPL · Test / precursor | Launch failure | Ranger test flight stranded in Earth orbit. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | Ranger 3US (United States)NASA / JPL · Impactor | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Ranger 4US (United States)NASA / JPL · Impactor | Failure |
Firsts: First US spacecraft to strike the Moon Sources differ: NSSDCA lists it as an "Impact"; Siddiqi codes it a partial success. Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Ranger 5US (United States)NASA / JPL · Impactor | Failure | Missed the Moon by 725 km. Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna Ye-6 No.2USSR (Soviet Union)USSR · Lander | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna Ye-6 No.3USSR (Soviet Union)USSR · Lander | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna 4USSR (Soviet Union)USSR · Lander | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Ranger 6US (United States)NASA / JPL · Impactor | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna Ye-6 No.6USSR (Soviet Union)USSR · Lander | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna Ye-6 No.5USSR (Soviet Union)USSR · Lander | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Ranger 7US (United States)NASA / JPL · Impactor | Success |
Firsts: First US close-up images of the Moon Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Ranger 8US (United States)NASA / JPL · Impactor | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Kosmos 60 (Ye-6 No.9)USSR (Soviet Union)USSR · Lander | Launch failure | Stranded in Earth orbit. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Ranger 9US (United States)NASA / JPL · Impactor | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna Ye-6 No.8USSR (Soviet Union)USSR · Lander | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna 5USSR (Soviet Union)USSR · Lander | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 6USSR (Soviet Union)USSR · Lander | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Zond 3USSR (Soviet Union)USSR · Flyby | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 7USSR (Soviet Union)USSR · Lander | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 8USSR (Soviet Union)USSR · Lander | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 9USSR (Soviet Union)USSR · Lander | Success |
Firsts: First survivable landing on the Moon; First images from the lunar surface Sources differ: Siddiqi lists Luna 9 as the "first survivable landing" and Surveyor 1 as the "first soft-landing"; NSSDCA credits the Soviet programme with the first soft landing. See the records ledger. Sources: NASA NSSDCA (read 23 Sep 2026) · NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Kosmos 111USSR (Soviet Union)USSR · Orbiter | Launch failure | Stranded in Earth orbit. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna 10USSR (Soviet Union)USSR · Orbiter | Success |
Firsts: First lunar orbiter Sources: NASA NSSDCA (read 23 Sep 2026) · NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Surveyor 1US (United States)NASA / JPL · Lander | Success |
Firsts: First US soft landing ("first soft-landing" in Siddiqi’s ledger) Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Explorer 33US (United States)NASA · Orbiter | Partial | Did not reach lunar orbit. NSSDCA: it "failed to achieve lunar orbit but did achieve mission objectives". Sources differ: Wikipedia lists a launch failure; NSSDCA and Siddiqi (code P) record a partial success. Sources: NASA NSSDCA Master Catalog (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Lunar Orbiter 1US (United States)NASA · Orbiter | Success |
Firsts: First US lunar orbiter Sources differ: Wikipedia lists a partial failure; Siddiqi codes a success. NSSDCA notes about 75% of the intended mission because of image smearing. Sources: NASA NSSDCA Master Catalog (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 11USSR (Soviet Union)USSR · Orbiter | Partial |
Its camera photographed only empty space. Siddiqi’s table codes the mission a success. Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Surveyor 2US (United States)NASA / JPL · Lander | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 12USSR (Soviet Union)USSR · Orbiter | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Lunar Orbiter 2US (United States)NASA · Orbiter | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 13USSR (Soviet Union)USSR · Lander | Success |
Firsts: First measurement of lunar soil properties (penetrometer) Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Lunar Orbiter 3US (United States)NASA · Orbiter | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Surveyor 3US (United States)NASA / JPL · Lander | Success |
Visited by the Apollo 12 crew in November 1969. Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Lunar Orbiter 4US (United States)NASA · Orbiter | Success |
Firsts: First spacecraft in polar lunar orbit Sources differ: The NSSDCA timeline prints 8 May, which is the orbit-insertion date; launch was 4 May. Sources: NASA NSSDCA Master Catalog (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Kosmos 159 (Ye-6LS No.111)USSR (Soviet Union)USSR · Test / precursor | Partial | A lunar-orbiter test left stranded in high Earth orbit; Siddiqi codes it a partial success. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Surveyor 4US (United States)NASA / JPL · Lander | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Explorer 35 (IMP-E)US (United States)NASA · Orbiter | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Lunar Orbiter 5US (United States)NASA · Orbiter | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Surveyor 5US (United States)NASA / JPL · Lander | Success |
Firsts: First chemical analysis of lunar soil (alpha-scattering) Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Soyuz 7K-L1 No.4L (Zond)USSR (Soviet Union)USSR · Uncrewed circumlunar return | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Surveyor 6US (United States)NASA / JPL · Lander | Success |
Firsts: First powered takeoff from the lunar surface Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Soyuz 7K-L1 No.5L (Zond)USSR (Soviet Union)USSR · Uncrewed circumlunar return | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Surveyor 7US (United States)NASA / JPL · Lander | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna Ye-6LS No.112USSR (Soviet Union)USSR · Orbiter | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna 14USSR (Soviet Union)USSR · Orbiter | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Soyuz 7K-L1 No.7L (Zond)USSR (Soviet Union)USSR · Uncrewed circumlunar return | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Zond 5USSR (Soviet Union)USSR · Uncrewed circumlunar return | Success |
Firsts: First spacecraft to fly around the Moon and return to Earth, carrying living organisms Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Zond 6USSR (Soviet Union)USSR · Uncrewed circumlunar return | Partial |
The flyby and guided skip re-entry worked; slow decompression then triggered the main parachute’s jettison at about 5.3 km. Sources differ: Siddiqi codes it a success; Wikipedia records a spacecraft failure. Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Apollo 8US (United States)NASA · Crewed lunar orbit · crewed | Success |
Firsts: First crewed lunar orbit (Borman, Lovell, Anders) Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Soyuz 7K-L1 No.13L (Zond)USSR (Soviet Union)USSR · Uncrewed circumlunar return | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna Ye-8 No.201 (Lunokhod)USSR (Soviet Union)USSR · Lander + rover | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Soyuz 7K-L1S No.2 (N1 3L)USSR (Soviet Union)USSR · Test / precursor | Launch failure | Test orbiter for the Soviet crewed-landing programme, on the N1 rocket. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Apollo 10US (United States)NASA · Crewed lunar orbit · crewed | Success |
Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna Ye-8-5 No.402USSR (Soviet Union)USSR · Sample return | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Soyuz 7K-L1S No.5USSR (Soviet Union)USSR · Test / precursor | Launch failure | Test orbiter for the Soviet crewed-landing programme, on the N1 rocket. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna 15USSR (Soviet Union)USSR · Sample return | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Apollo 11US (United States)NASA · Crewed landing · crewed | Success |
Firsts: First crewed landing on the Moon; First sample return Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Zond 7USSR (Soviet Union)USSR · Uncrewed circumlunar return | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Kosmos 300USSR (Soviet Union)USSR · Sample return | Launch failure | Stranded in Earth orbit. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Kosmos 305USSR (Soviet Union)USSR · Sample return | Launch failure | Stranded in Earth orbit. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Apollo 12US (United States)NASA · Crewed landing · crewed | Success |
Firsts: First pinpoint crewed landing Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna Ye-8-5 No.405USSR (Soviet Union)USSR · Sample return | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Apollo 13US (United States)NASA · Crewed lunar flyby · crewed | Failure |
The crew was rescued. Set the human distance record (248,655 mi / 400,171 km) that stood until Artemis II. Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) · NASA (mission blog) (6 Apr 2026) |
| Launch: | Luna 16USSR (Soviet Union)USSR · Sample return | Success |
Firsts: First robotic sample return Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Zond 8USSR (Soviet Union)USSR · Uncrewed circumlunar return | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 17 / Lunokhod 1USSR (Soviet Union)USSR · Lander + rover | Success |
Firsts: First robotic rover on another world Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Apollo 14US (United States)NASA · Crewed landing · crewed | Success |
Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Apollo 15US (United States)NASA · Crewed landing · crewed | Success |
Firsts: First crewed rover (Lunar Roving Vehicle): unloaded and driven on the first moonwalk, 31 Jul 1971, 13:13–19:46 UTC (NSSDCA) Sources: NASA NSSDCA (read 23 Sep 2026) · NASA NSSDCA Master Catalog (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 18USSR (Soviet Union)USSR · Sample return | Failure |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 19USSR (Soviet Union)USSR · Orbiter | Success |
A gyro fault left it in a higher orbit than planned; it operated for 13 months. Siddiqi codes it a partial success (and prints the orbit year as 1972, a typo). Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 20USSR (Soviet Union)USSR · Sample return | Success |
Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Apollo 16US (United States)NASA · Crewed landing · crewed | Success |
Sources differ: The NSSDCA index shows 20 April (US date); the landing was 21 April UTC. Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Soyuz 7K-LOK No.6A (N1 7L)USSR (Soviet Union)USSR · Orbiter | Launch failure | Lunar orbiter for the Soviet crewed programme, on the N1 rocket. Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Apollo 17US (United States)NASA · Crewed landing · crewed | Success |
Firsts: First scientist on the Moon (Harrison Schmitt) Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 21 / Lunokhod 2USSR (Soviet Union)USSR · Lander + rover | Success |
Sources: NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Explorer 49 (RAE-B)US (United States)NASA · Orbiter | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 22USSR (Soviet Union)USSR · Orbiter | Success |
Sources differ: The NSSDCA timeline prints 2 June, the orbit date; launch was 29 May. Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna 23USSR (Soviet Union)USSR · Sample return | Partial |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Luna Ye-8-5M No.412USSR (Soviet Union)USSR · Sample return | Launch failure | Sources: NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Luna 24USSR (Soviet Union)USSR · Sample return | Success |
The last Soviet lunar mission, and the last soft landing on the Moon until Chang’e 3 in 2013. Sources differ: NSSDCA pages print 14 Aug, the lunar-orbit date; launch was 9 Aug. Landing time is 06:36 UT (Siddiqi) or 02:00 UT (NSSDCA). Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA NSSDCA (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Hiten (MUSES-A) + HagoromoJP (Japan)ISAS · Orbiter | Partial |
Firsts: First lunar mission by a country other than the US or USSR; Demonstrated aerobraking (first pass 19 Mar 1991) Hiten itself worked; its Hagoromo sub-probe’s transmitter failed. Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | ClementineUS (United States)DoD (BMDO) + NASA · Orbiter | Success |
Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | AsiaSat 3 / HGS-1US (United States)Hughes Global Services (commercial salvage) · Flyby | Success |
Firsts: First commercial satellite to fly past the Moon (rescued from a bad transfer orbit) Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Lunar ProspectorUS (United States)NASA · Orbiter | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | SMART-1ESA (Europe (ESA))ESA · Orbiter | Success |
Firsts: First European lunar mission; solar-electric propulsion Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Kaguya / SELENE (+ Okina, Ouna)JP (Japan)JAXA · Orbiter | Success |
Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Chang’e 1CN (China)CNSA · Orbiter | Success |
Firsts: China’s first lunar mission Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Chandrayaan-1 (+ Moon Impact Probe)IN (India)ISRO · Orbiter | Partial |
Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Lunar Reconnaissance OrbiterUS (United States)NASA · Orbiter | Operating |
Still operating; the imaging reference for every later landing. Sources differ: The NSSDCA timeline prints 17 Jun 2009; launch was 18 Jun 2009, 21:32 UTC. Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | LCROSSUS (United States)NASA · Impactor | Success |
Confirmed water ice in a permanently shadowed crater. Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: – | ARTEMIS P1/P2 (THEMIS-B/C)US (United States)NASA · Orbiter | Success |
Firsts: First spacecraft to orbit the Earth–Moon L2 point (the first relay there was Queqiao, 2018) Launched earlier as THEMIS Earth-orbit probes and redirected to the Moon; our sources date the lunar phase, not the launch. Sources: NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Chang’e 2CN (China)CNSA · Orbiter | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) · China National Space Administration (22 Nov 2013) |
| Launch: | GRAIL (Ebb & Flow)US (United States)NASA · Orbiter | Success |
Twin probes that mapped the Moon’s gravity. Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | LADEEUS (United States)NASA · Orbiter | Success |
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) |
| Launch: | Chang’e 3 / YutuCN (China)CNSA · Lander + rover | Success |
Firsts: First soft landing on the Moon since Luna 24 (1976); China became the third nation to soft-land The Yutu rover lost mobility during its second lunar day (2014) and operated until 2016. Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA NSSDCA (updated 10 Jul 2025) · NASA History Division (A. Siddiqi) (Sep 2018) · Wikipedia (read 23 Sep 2026, secondary) · SpaceNews (14 Jan 2025) |
| Launch: | Chang’e 5-T1 (+ Manfred Memorial Moon Mission)CN (China)CNSA · Uncrewed circumlunar returnPartners: LuxSpace (Luxembourg): 4M payload | Success |
LuxSpace billed its 4M payload as the first privately funded mission to the Moon. It was not the first private hardware past the Moon: AsiaSat 3/HGS-1 flew by in 1998. Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) |
| Launch: | Queqiao (+ Longjiang-1/2)CN (China)CNSA · Relay | Success |
Firsts: First communications relay at the Earth–Moon L2 point Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA NSSDCA (updated 10 Jul 2025) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Chang’e 4 / Yutu-2CN (China)CNSA · Lander + rover | Success |
Firsts: First landing on the lunar far side The lander continues science operations (Planetary Society). No official Yutu-2 status since 2024; NASA LRO images analysed by Phil Stooke suggest it has not moved since March 2024. Sources: NASA NSSDCA (updated 10 Jul 2025) · The Planetary Society (read 23 Sep 2026, secondary) · SpaceNews (14 Jan 2025) |
| Launch: | BeresheetIL (Israel)SpaceIL + IAI (privately funded) · Lander | Failure |
Firsts: First privately funded spacecraft to orbit the Moon Sources: UPI (11 Apr 2019) · NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | Chandrayaan-2 (orbiter + Vikram + Pragyan)IN (India)ISRO · Lander + rover | Partial |
The orbiter is still operating. Sources differ: The NSSDCA timeline prints "Apr 2019"; NSSDCA’s own catalogue record gives 22 Jul 2019. Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA NSSDCA Master Catalog (Internet Archive copy) (read 23 Sep 2026) · NASASpaceflight (Sep 2019) |
| Launch: | Chang’e 5CN (China)CNSA · Sample return | Success |
Firsts: First lunar sample return since 1976; First robotic rendezvous and docking in lunar orbit Sources: NASA NSSDCA (updated 10 Jul 2025) · China National Space Administration (19 Dec 2020) · Xinhua (22 Feb 2021) · China Academy of Space Technology (CAST) (6 Dec 2020) |
| Launch: | CAPSTONEUS (United States)NASA + Advanced Space · Orbiter | Success |
Firsts: First spacecraft in a near-rectilinear halo orbit NASA’s activities on CAPSTONE concluded in June 2026; Advanced Space continues to use the spacecraft as a technology testbed. Sources: NASA NSSDCA Master Catalog (read 23 Sep 2026) · NASA NSSDCA (updated 10 Jul 2025) · NASA (Jul 2026) |
| Launch: | Danuri (KPLO)KR (South Korea)KARI (now KASA) · OrbiterPartners: NASA ShadowCam | Operating |
Firsts: South Korea’s first lunar mission Operations extended through the end of 2027. Sources: Korea AeroSpace Administration (11 Feb 2025) · Korea Herald (read 23 Sep 2026) · NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | Artemis I (Orion, uncrewed)US (United States)NASA · Test / precursorPartners: ESA (European Service Module) | Success |
Firsts: First flight of SLS Unexpected char loss on Orion’s heat shield led NASA to fly Artemis II on a modified entry profile. Sources: NASA (read 23 Sep 2026) · NASA NSSDCA (updated 10 Jul 2025) · NASA Office of Inspector General (IG-26-004) (10 Mar 2026) |
| Launch: | OMOTENASHI (Artemis I cubesat)JP (Japan)JAXA · Lander | Failure |
Would have been the smallest lunar lander. Sources: NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | EQUULEUS (Artemis I cubesat)JP (Japan)JAXA + University of Tokyo · Flyby | Success |
Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | LunaH-Map (Artemis I cubesat)US (United States)Arizona State University · Orbiter | Failure |
Sources: NASA Science (blog) (3 Aug 2023) · NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | Lunar IceCube (Artemis I cubesat)US (United States)Morehead State University · Orbiter | Failure | Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | LunIR (Artemis I cubesat)US (United States)Lockheed Martin · Flyby | Partial | Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | Hakuto-R Mission 1 (+ Rashid, SORA-Q)JP (Japan)ispace (private) · Lander + roverPartners: UAE MBRSC (Rashid rover); JAXA (SORA-Q) | Failure |
Firsts: First private Japanese landing attempt; First Arab-built lunar rover (lost with the lander) ispace (26 May 2023): the lander estimated its altitude as zero while it was about 5 km above the surface, ran out of propellant and is believed to have fallen; the most likely cause was that “the software did not perform as expected”. Sources: ispace (26 May 2023) · NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | Lunar FlashlightUS (United States)NASA / JPL · Orbiter | Failure |
Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | Chandrayaan-3 (Vikram + Pragyan)IN (India)ISRO · Lander + rover | Success |
Firsts: First landing in the south polar region (as ISRO defines it); India became the fourth nation to soft-land The Pragyan rover drove about 101 m. Sources differ: "South polar region" has no agreed boundary; see the records ledger. Sources: ISRO (read 24 Sep 2026) · IAU Gazetteer of Planetary Nomenclature (USGS) (19 Mar 2024) · ISRO (read 23 Sep 2026) · NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | Luna 25RU (Russia)Roscosmos · Lander | Failure |
Firsts: First Russian lunar mission since 1976 Sources: Spaceflight Now (20 Aug 2023) · NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | SLIM (+ LEV-1, LEV-2/SORA-Q)JP (Japan)JAXA · Lander | Success |
Firsts: First "pinpoint" landing: position error of about 10 m or less before the obstacle-avoidance manoeuvre; Japan became the fifth nation to soft-land |
| Launch: | Peregrine Mission OneUS (United States)Astrobotic (NASA CLPS) · Lander | Failure |
First Vulcan flight. Its planned site was Sinus Viscositatis; it never attempted a landing. Sources: NASA (19 Jan 2024) · NASA Science (updated 23 Oct 2026) |
| Launch: | IM-1 OdysseusUS (United States)Intuitive Machines (NASA CLPS) · Lander | Partial |
Firsts: First commercial soft landing; First US landing since 1972 NASA LRO: it came to rest at 80.13°S, 1.44°E, in a crater where the terrain slopes 12 degrees. Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA (Feb 2024) · NASA APOD (24 Feb 2024) · NASA Science (updated 23 Oct 2026) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Queqiao-2 (+ Tiandu-1/2)CN (China)CNSA · Relay | Operating |
Tested links with Chang’e 4 on the far side (6 Apr 2024) and with Chang’e 6 while it was still on the ground (8–9 Apr); relayed for Chang’e 6 in June 2024; will relay for Chang’e 7 and 8 when they fly. Design life 8 years (CNSA’s Chang’e-6 deputy chief designer, as quoted). Sources: China National Space Administration (25 Mar 2024) · China National Space Administration (12 Apr 2024) · Huaxi Metropolis Daily (quoting CNSA’s Wang Qiong) (21 Mar 2024) · NASA NSSDCA (updated 10 Jul 2025) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: | Chang’e 6 (+ ICUBE-Q)CN (China)CNSA · Sample returnPartners: France (DORN); ESA/Sweden (NILS); Italy (INRRI); Pakistan (ICUBE-Q cubesat) | Success |
Firsts: First samples ever returned from the lunar far side Unconfirmed (reported but not confirmed by a primary source):
Sources: China National Space Administration (Xinhua) (28 Jun 2024) · The Planetary Society (read 23 Sep 2026, secondary) · NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | Blue Ghost Mission 1US (United States)Firefly Aerospace (NASA CLPS) · Lander | Success |
Firsts: First fully successful commercial lunar landing All 10 NASA payloads operated. The mission ended on 16 Mar 2025 after 119 GB of data, including 51 GB of science and technology data (NASA). Firefly calls it "the first fully successful commercial Moon landing". Sources: NASA (2 Mar 2025) · NASA (18 Mar 2025) · Firefly Aerospace (read 24 Sep 2026) · NASA Science (updated 23 Oct 2026) |
| Launch: | Hakuto-R Mission 2 "Resilience" (+ Tenacious)JP (Japan)ispace · Lander + rover | Failure |
ispace (24 Jun 2025): the technical cause was “an anomaly in the LRF [laser range finder] hardware”; valid measurements came late and the lander could not slow down enough. Sources: ispace (24 Jun 2025) · NASA NSSDCA (updated 10 Jul 2025) |
| Launch: | IM-2 Athena (+ PRIME-1, Grace, MAPP, Yaoki)US (United States)Intuitive Machines (NASA CLPS) · Lander | Partial |
Firsts: Southernmost landing to date: 84.79°S (LROC); NASA: "closer to the lunar South Pole than any previous lander" NASA’s release body gives "more than 1,300 feet (400 meters)"; its photo caption says about 820 ft. Sources: NASA (release 25-025) (7 Mar 2025) · LROC team (Arizona State University, NASA LRO) (Mar 2025) · NASA (updated 29 Apr 2025) |
| Launch: | Lunar TrailblazerUS (United States)NASA / Caltech (SIMPLEx) · Orbiter | Failure |
Sources: NASA JPL (4 Aug 2025) |
| Launch: | Artemis II (Orion)US (United States)NASA · Crewed lunar flyby · crewedPartners: CSA (Jeremy Hansen); ESA (European Service Module) | Success |
Firsts: First crewed flight beyond low Earth orbit since 1972; Greatest distance from Earth ever reached by humans Crew: Reid Wiseman (commander), Victor Glover (pilot), Christina Koch and Jeremy Hansen (CSA), in the Orion spacecraft named Integrity. SLS put Orion in a high Earth orbit; Orion’s own engine fired the trans-lunar injection. Heat-shield char loss was "significantly reduced": NASA’s post-flight analysis (15 Oct 2026) found "only nine spots of char loss of varying sizes" on the heat shield, "compared to 103 during Artemis I", and performance "in line with engineering predictions". NASA is investigating a urine vent-line issue. Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA (20 Apr 2026) · NASA (15 Oct 2026) · NASA (mission blog) (6 Apr 2026) · NASA (mission blog) (10 Apr 2026) · NASA (mission blog) (1 Apr 2026) · NASA (read 24 Sep 2026) · Via Satellite (12 Apr 2026) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: – | Chang’e 7CN (China)China (lunar exploration programme; statements issued by CMSA) · Lander + rover | Postponed |
Orbiter, lander, rover and a hopping probe for permanently shadowed craters; six international instruments. CMSA, 23 Aug 2026: "In line with the principle of being prudent, reliable and failure-proof, and after a comprehensive assessment, the Chang’e-7 mission does not meet launch conditions and cannot be carried out in this year’s planned window." No cause and no new date were given. Thailand’s NARIT (a payload partner) said the main driver "appeared to be" weather, specifically higher-altitude winds, and expects a 2027 window; a partner statement, not China’s. Unconfirmed (reported but not confirmed by a primary source):
Sources: China Manned Space Agency (CMSE site) (23 Aug 2026) · Xinhua (23 Aug 2026) · China Manned Space Agency (CMSE site) (19 Aug 2026) · gov.cn (Xinhua) (7 Sep 2024) · CNN (23 Aug 2026) · China in Space (31 Aug 2026) |
| Launch: | Griffin Mission One ("Moon Base II")US (United States)Voyager Lunar Systems (Astrobotic), a Voyager Technologies company (NASA CLPS) · Lander + rover | Scheduled | Lander plus Astrolab’s FLIP rover for the Nobile crater region near Mons Mouton, near the south pole, 10 payloads in all; on 15 Sep 2026 NASA expected it to be the only lunar launch of 2026. Falcon Heavy per Spaceflight Now. Voyager Technologies completed its acquisition of Astrobotic on 13 Jul 2026. Sources differ: NASA’s own pages name the site differently: its Griffin-1 event page says "the Nobile Crater at the lunar South Pole"; its CLPS deliveries page says Mons Mouton. The two are neighbours, so we say "the Nobile crater region near Mons Mouton". Sources: NASA (20 Oct 2026) · Voyager Technologies (SEC filing) (2 Nov 2026) · The Space Review (26 Oct 2026) · Aerospace America (AIAA) (15 Sep 2026) · NASA (updated 14 Oct 2026) · NASA Science (updated 23 Oct 2026) · Voyager Technologies (13 Jul 2026) · Spaceflight Now (16 Jun 2026) · NASA (release 26-046) (26 May 2026) |
| Launch: First part of 2027 (NASA, 15 Sep 2026; was "no earlier than fall 2026") | Blue Moon MK1 "Endurance" ("Moon Base I")US (United States)Blue Origin (NASA CLPS) · Lander | Scheduled | Uncrewed cargo pathfinder (not the crew lander) for the Shackleton connecting ridge, carrying NASA’s SCALPSS cameras and a laser retroreflector. The slip followed the New Glenn explosion on its pad in May 2026. Sources: Aerospace America (AIAA) (15 Sep 2026) · NASA (release 26-046) (26 May 2026) · Spaceflight Now (30 Jun 2026) |
| Launch: First part of 2027 (NASA); first quarter of 2027 (Intuitive Machines CEO) | IM-3 Nova-C "Trinity" ("Moon Base III")US (United States)Intuitive Machines (NASA CLPS) · LanderPartners: ESA; KASI (Korea) | Scheduled | Reiner Gamma swirl (Lunar Vertex). NASA had said 2026 on 26 May 2026. Sources: Aerospace America (AIAA) (15 Sep 2026) · NASA (release 26-046) (26 May 2026) · NASA Science (updated 23 Oct 2026) |
| Launch: | IM-4 (CP-22)US (United States)Intuitive Machines (NASA CLPS) · Lander | Scheduled | Mons Mouton. Sources: NASA Science (updated 23 Oct 2026) · NASA NSSDCA Master Catalog (read 23 Sep 2026) |
| Launch: | Blue Moon MK1 #2 with VIPERUS (United States)Blue Origin / NASA · Lander + rover | Scheduled | VIPER was cancelled in July 2024 and conditionally revived on 19 Sep 2025. The base task order covers design and demonstration; NASA "will make the decision to exercise that option after the execution and review of the base task and of Blue Origin’s first flight of the Blue Moon MK1 lander", which has slipped to early 2027. On 20 Oct 2026 NASA said VIPER "will embark on a mission to the lunar South Pole region in 2027" and that the rover is "fully built and undergoing final testing"; no decision to exercise the option has been announced. $190M is the total potential value. Sources: NASA (19 Sep 2025) · NASA (17 Jul 2024) · NASA (20 Oct 2026) |
| Launch: | ispace Mission 2.5 (first Lunar Connect relay satellite)JP (Japan)ispace (satellite); delivered to lunar orbit by Argo Space · RelayPartners: Argo Space (Argonaut transfer vehicle) | Scheduled | One satellite, Alpine, the first of ispace’s Lunar Connect constellation ("at least five satellites orbiting the Moon" planned) for communication and positioning. Argo Space carries it to lunar orbit on its water-powered Argonaut vehicle; the delivery contract was finalised on 17 Sep 2026. |
| Launch: Later in 2027 (NASA, 15 Sep 2026) | Blue Ghost Mission 2 (+ Lunar Pathfinder, LuSEE-Night, Rashid 2)US (United States)Firefly Aerospace (NASA CLPS) · Lander + roverPartners: ESA/SSTL (Lunar Pathfinder relay); UAE MBRSC (Rashid 2 rover) | Scheduled | Far-side lander. ESA’s Lunar Pathfinder relay and the UAE’s Rashid 2 rover ride with it, so their dates follow this mission. Sources: Aerospace America (AIAA) (15 Sep 2026) · NASA Science (updated 23 Oct 2026) · Firefly Aerospace (22 May 2025) · Dubai Media Office (MBRSC) (3 Nov 2025) |
| Launch: | Blue Ghost Mission 3 (CP-21)US (United States)Firefly Aerospace (NASA CLPS) · Lander | Scheduled | Gruithuisen Domes; six NASA payloads ($179M). Sources: NASA (18 Dec 2024) · NASA Science (updated 23 Oct 2026) |
| Launch: | Four CLPS deliveries awarded 30 Jun 2026US (United States)Astrobotic (2), Firefly, Intuitive Machines · Lander | Scheduled | Astrobotic $297.9M for two, Firefly $144.2M, Intuitive Machines $148.3M. Common payloads: SCALPSS, a laser retroreflector and the LETS radiation spectrometer. Unconfirmed (reported but not confirmed by a primary source):
Sources: NASA (30 Jun 2026) · Via Satellite (30 Jun 2026) |
| Launch: | MoonFall dronesUS (United States)NASA (spacecraft built by Firefly) · Test / precursor | Scheduled | Four drones to scout Artemis landing sites. Sources: NASA (release 26-046) (26 May 2026) |
| Launch: | Artemis IV: first crewed landing since 1972US (United States)NASA · Crewed landing · crewed | Scheduled | Four crew; two descend near the lunar south pole. NASA: "Lander readiness will determine which provider will safely carry them to the surface": SpaceX Starship HLS or Blue Origin Blue Moon. SpaceX’s existing contract covered the former Artemis III and IV landings. Sources: NASA (23 Oct 2026) · NASA (mission blog) (23 Oct 2026) · NASA (RELEASE 26-022) (27 Feb 2026) · NASA ESDMD (3 Mar 2026) · NASA (updated 16 Mar 2026) · U.S. GAO (GAO-26-108556) (23 Jul 2026) · NASA Office of Inspector General (IG-26-004) (10 Mar 2026) |
| Launch: | Artemis V: second landingUS (United States)NASA · Crewed landing · crewed | Scheduled | NASA: "future missions about once per year thereafter". GAO (July 2026): the single remaining ICPS upper stage flies on Artemis IV, and Vulcan Centaur V upper stages on "subsequent missions". Before the February 2026 restructure it was assigned Blue Moon Mk2 with a launch "no later than March 2030" (OIG). Sources: NASA ESDMD (3 Mar 2026) · U.S. GAO (GAO-26-108556) (23 Jul 2026) · NASA Office of Inspector General (IG-26-004) (10 Mar 2026) |
| Launch: | Chandrayaan-4 (sample return)IN (India)ISRO · Sample return | Scheduled | Five modules on at least two LVM-3 launches, assembled in orbit. Unconfirmed (reported but not confirmed by a primary source):
Sources: Republic World (12 Dec 2025) · Business Standard (6 Feb 2025) · All India Radio News (5 Feb 2026) |
| Launch: | Chandrayaan-5 / LUPEXIN (India)ISRO · Lander + roverPartners: JAXA (rover) | Scheduled | South-polar volatiles: drilling and water-ice measurement. The ISRO chairman said in mid-March 2025 that approval had come "just three days back", and described a 250 kg rover built with Japan (IANS). Launch on JAXA’s H3-24L (ISRO: "The mission will be launched by JAXA onboard its H3-24L launch vehicle"). Sources: Republic World (12 Dec 2025) · All India Radio News (5 Feb 2026) · IANS (via NewKerala) (17 Mar 2025) · ISRO (15 May 2025) |
| Launch: | ispace Mission 3 (ULTRA lander)JP (Japan)ispace · Lander | Scheduled | Formerly Mission 4; METI SBIR funded. Launch contracted on an MHI H3 rocket (29 Jul 2026). |
| Launch: | ESA Moonlight (comms and navigation)ESA (Europe (ESA))ESA with Telespazio / SSTL · Relay | Scheduled | Sources: ESA (15 Oct 2024) |
| Launch: | Luna-26RU (Russia)Roscosmos / IKI · Orbiter | Scheduled | Polar orbiter and relay. Sources: IKI RAS (read 3 Nov 2026) · Meduza (relaying Kommersant) (7 Apr 2026) |
| Launch: | Blue Ghost Mission 4 (CS-6)US (United States)Firefly Aerospace (NASA CLPS) · Lander | Scheduled | South pole region. Sources: NASA (29 Jul 2025) · NASA Science (updated 23 Oct 2026) |
| Launch: | Chang’e 8CN (China)China (lunar exploration programme) · Lander + roverPartners: Pakistan (Jinnah-1 rover, 30 kg); other international payloads (200 kg capacity) | Scheduled | Lander, rover and a multi-purpose robot for the Leibnitz-Beta Plateau near the south pole (CNSA); tests 3-D printing of bricks from regolith. Chang’e 7 and 8 are to be parts of the ILRS "basic model". SpaceNews reported on 10 Sep 2026 that CMSA, now in charge of lunar missions, "appears to be reconfiguring" the robotic landing programme; there is no official statement. Unconfirmed (reported but not confirmed by a primary source):
Sources: China National Space Administration (Xinhua) (24 Apr 2025) · gov.cn (Xinhua) (7 Sep 2024) · China National Space Administration (Xinhua) (24 Apr 2025) · Dawn (13 Aug 2026) · SpaceNews (Apr 2025) · SpaceNews (10 Sep 2026) |
| Launch: | ispace Mission 4JP (Japan)ispace · Lander | Scheduled | Formerly Mission 6; Space Strategy Fund. Sources: ispace (27 Mar 2026) |
| Launch: | Luna-27A and 27B (landers)RU (Russia)Roscosmos · Lander | Scheduled | Unconfirmed (reported but not confirmed by a primary source):
Sources: IKI RAS (read 3 Nov 2026) · Interfax (11 Aug 2025) · Meduza (relaying Kommersant) (7 Apr 2026) · Wikipedia (read 23 Sep 2026, secondary) |
| Launch: Before 2030 (2030年前) | China’s first crewed landingCN (China)China Manned Space Agency · Crewed landing · crewed | Scheduled | Two Long March 10 launches; Mengzhou and the two-seat Lanyue lander meet in lunar orbit. Crew of three, two landing (Wang Xiang, 7th Manned Space Symposium, 31 Oct 2026, reported by Global Times; Mengzhou’s three seats to lunar orbit were in CMSA’s 2024 naming announcement). CMSA, 23 May 2026: go all out to achieve, "on schedule" (如期), the first Chinese landing before 2030. No launch sequence has been officially dated. Sources: China Manned Space Agency (CMSE site) (23 May 2026) · China Manned Space Agency (CMSE site) (27 Feb 2026) · China Manned Space Agency (CMSE site) (14 Jun 2024) · SpaceNews (Jul 2023) · Global Times (Fan Wei), via Sina (31 Oct 2026) · CCTV.com (CMSA naming announcement) (24 Feb 2024) |
| Launch: | ESA ArgonautESA (Europe (ESA))ESA (Thales Alenia Space-led) · Lander | Scheduled | Cargo lander for the south polar region; carries roughly 1,500 kg to the surface. Unconfirmed (reported but not confirmed by a primary source):
Sources: ESA (PR N°76–2025) (20 Nov 2025) · ESA (PR N°6–2025) (30 Jan 2025) |
| Launch: | Luna-29RU (Russia)Roscosmos · Orbiter | Projected | An orbital spacecraft (орбитальный аппарат), per a Russian Academy of Sciences presentation (Interfax and Kommersant via Meduza, Apr 2026). Sources: Interfax (7 Apr 2026) · Meduza (relaying Kommersant) (7 Apr 2026) |
| Launch: | Korean lunar landerKR (South Korea)KASA · Lander | Scheduled | The 1.8-ton national lander stays at 2032. On 3 Jul 2026 the National Space Committee approved moving a 700 kg public-private lander up by two years to 2030, on a Nuri rocket, as "a crucial stepping stone" toward it (KASA, as reported by Korea JoongAng Daily and SatNews). The 2030 lander has no row of its own yet: no KASA primary has been fetched. Unconfirmed (reported but not confirmed by a primary source):
Sources: Korea Herald (read 23 Sep 2026) · Korea JoongAng Daily (20 Jul 2026) · SatNews (16 Jul 2026) |
| Launch: | Luna-30 (heavy rover)RU (Russia)Roscosmos · Lander + rover | Projected | The spacecraft carrying the rovers (Russian Academy of Sciences, Apr 2026). Sources: Interfax (7 Apr 2026) · Meduza (relaying Kommersant) (7 Apr 2026) |
| Launch: | Luna-28 (sample return)RU (Russia)Roscosmos · Sample return | Projected | Sources: Interfax (7 Apr 2026) · Meduza (relaying Kommersant) (7 Apr 2026) |
| Launch: | Indian crewed landingIN (India)Government of India · Crewed landing · crewed | Projected | A policy goal with no hardware schedule behind it. Sources: Business Today (18 Oct 2023) |
| Launch: – | IM-5, Intuitive Machines Nova-D (CT-4)US (United States)Intuitive Machines (NASA CLPS) · Lander | Scheduled | Awarded 24 Mar 2026 ($180.4M); targets Mons Malapert near the south pole; the first CLPS order to need the larger Nova-D lander. Intuitive Machines says seven payloads; NASA’s CLPS page lists six NASA payloads. No launch year has been given. Unconfirmed (reported but not confirmed by a primary source):
Sources: Intuitive Machines (24 Mar 2026) · NASA Science (updated 23 Oct 2026) · The Planetary Society (24 Mar 2026) |
| Launch: – | CP-12 far-side delivery (Draper / ispace-U.S.; ispace’s Mission 5)JP (Japan)ispace-U.S. + Draper (NASA CLPS) · Lander | Cancelled | Schrödinger basin on the far side. Slipped from 2026 to 2027 (May 2025), then to 2030 after an engine-vendor change (ispace, 27 Mar 2026). On 15 Jul 2026 ispace announced that Draper “has mutually agreed with NASA to end” CLPS task order CP-12; ispace-U.S. plans to bid under the next CLPS framework instead. Sources: ispace (15 Jul 2026) · ispace (27 Mar 2026) · ispace-U.S. (9 May 2025) |
| Launch: – | Beresheet 2IL (Israel)SpaceIL · Lander | Paused | Was targeted for 2025. The March 2025 funding deadline was missed and the project suspended; an ISA–ASI letter of intent (January 2025) has produced no binding agreement. Unconfirmed (reported but not confirmed by a primary source):
|
Licence: this data is published under CC BY 4.0 (Creative Commons Attribution 4.0 International). Use it, share it and adapt it, commercially too, with credit to SpaceNexus and a link. It is our own compilation from the public sources linked on every row; quoted statements and those sources remain their owners’, and the illustrations are not part of the dataset.
Suggested citation
SpaceNexus. (2026). Race to the Moon: catalogue of lunar missions since 1958 (Version 2026-11-03) [Data set]. https://doi.org/10.5281/zenodo.22985974. Licensed CC BY 4.0.
@misc{spacenexus_moon_catalogue_20261103,
author = {{SpaceNexus}},
title = {Race to the Moon: catalogue of lunar missions since 1958},
year = {2026},
version = {2026-11-03},
howpublished = {\url{https://spacenexus.us/moon/missions}},
doi = {10.5281/zenodo.22985974},
note = {Licensed CC BY 4.0},
}Version 2026-11-03: the date the data was last reviewed against its sources. Persistent identifier: https://doi.org/10.5281/zenodo.22985974. Download: CSV (UTF-8).
Week in Space Data, every Friday.