Week in Space Data, every Friday.

Blue Origin · United States · First flight 2025 · Reusable first stage
Blue Origin's orbital heavy-lift launch vehicle, with a reusable first stage powered by seven BE-4 engines and a seven-meter payload fairing. Named after astronaut John Glenn. It landed its first stage for the first time on its second flight in November 2025. The third flight (NG-3, April 19, 2026) suffered an upper-stage engine shortfall that left AST SpaceMobile's BlueBird 7 in too low an orbit, and the satellite was lost. On May 28, 2026, a New Glenn exploded during a static fire test at Launch Complex 36; Blue Origin traced the explosion to a main oxygen valve on one BE-4 engine and says it hopes to return New Glenn to flight by the end of 2026.
Want to choose exactly what you get? Build your own launch alert, free with an account: GO, liftoff, success, partial failure or failure, time changes, holds and scrubs, and reminders a day, an hour and ten minutes (push) before launches with an exact time, filtered by rocket, launch site, provider, crewed flights or Moon missions.
From SpaceNexus's launch tracker (tracked since Jan 16, 2025); outcomes recorded as each flight lands. Career totals above are the vehicle's full history.
| Height | 98 m |
| Diameter | 7 m |
| Stages | 2 |
| Engines | 7x BE-4 + 2x BE-3U |
| Propellant | CH4 / LOX (booster) + LH2 / LOX (upper) |
| Fairing diameter | 7 m |
| Payload to LEO | 45,000 kg |
| Payload to GTO | 13,000 kg |
| Reusable | Yes (first stage) |
| First flight | 2025-01-16 |
| Last flight | Active |
| Variants seen on the manifest | New Glenn |
Blue Origin has not published a list price for New Glenn.
The next tracked New Glenn launch is Blue Ring-1, Dec 2026 from Cape Canaveral SFS, FL, USA. Dates move; Mission Control carries the live countdown.
New Glenn has flown 3 times as of 2026-10-09, with 2 successes, 1 failures and 0 partial failures: a 66.7% success rate.
45,000 kg to low Earth orbit, 13,000 kg to geostationary transfer orbit.
Grounded while Launch Complex 36 is rebuilt after the May 28, 2026 static-fire explosion; return to flight targeted before the end of 2026.
Next: Return to flight from a rebuilt LC-36; the next tracked launch is what moves this to flying.
Sources: Spaceflight Now, 2026-04-20 · Space.com (FAA grounding) · Blue Origin statement, 2026-08-05 · Wikipedia: 2026 New Glenn rocket explosion
On the Promise Ledger: 4 entries: 1 met late; 2 revised; 1 pending. Exact words, primary sources, deadlines and outcomes.
The whole Promise Ledger · same rules for everyone, how entries are scored